PPT Slide
PROJECT ELEMENT 2.4 - STORMWATER DETENTION POND:
STORMWATER DETENTION ANALYSIS:
SPECIFIC QUESTIONS ASKED / DIRECTION PROVIDED BY THE M&C:
What regulatory requirements are we to follow: 1) for the AMMTC / CC Parking Deck, and 2) SE Quadrant of the Central Business District.
Provide a Alternate to the Stormwater Detention Pond with it’s Bio-Retention Components along with a cost analysis.
Adjust the location of the proposed Stormwater Detention Pond to provide Future Development area adjacent to the East Broad Street.