What's New in ACC All About Athens-Clarke County Judicial Branch and Courts Other Links of Note in ACC A Virtual Tour of ACC Landmarks ACCent Newsletter Online ACC Departments Pay Your Bills Online Where/How To... SPLOST Program Info Directory and Contact Information Mayor and Commission Info Return to Home Page
PROJECT II-21: LOCAL ROAD RESURFACING
GROUP A (FY01 Pavement Management Program) Referendum Statement: This project consists of the resurfacing and repair of existing public roads throughout Athens-Clarke County. These funds combined with the State of Georgia Grants will be utilized to resurface public roads based on the pavement condition ratings resulting from regular field inspections. This project is a next installment of the SPLOST IV Program. Project Location: Various roads throughout the entire Athens-Clarke County area.
  • Original Project Budget:
    • (Fixed) $4,000,000
    • (Variable) $ 533,353
  • Additional SPLOST Revenues Allocated: $500,000 (SPLOST IV)
  • Additional Requested Funding from General Fund – FY01 - FY05: $2,780,000 (FY02 – FY05 projected)
  • Total Project Budget: $8,688,353
  • Operating Budget Impact: $0
  • Projected Total LARP Funding: FY01 – FY05: $ 875,000
  • Budgets
    • FY01: $750,000
    • FY02: $812,500
    • FY03: $812,500
    • FY04: $812,500
    • FY05: $812,500
    • FY06: $533,353 (Variable)
PROJECT DESCRIPTION:
  • This project is considered an REOCURRING Project which is envisioned to be appropriated funds on an annual basis. This project is envisioned utilize a combination of SPLOST 2000 funds, Athens-Clarke County General Funds and State of Georgia Department of Transportation L.A.R.P. program funds.
  • The Pavement Management Program (Local Road Resurfacing) is let on an Annual Basis but the contract is structured to allow for two additional on-year periods providing satisfactory performance. Because of the fact that there will be multiple construction packages over multiple years, the Project Description for this project has been given a Group Letter which identifies a specific construction package. The 2000 (FY01) Pavement Management Program will be designated as Group A.
  • Listed below are the Streets by name that make up Group A. Attachment #1 describes in detail the type of improvements to be made as part of this construction package.
Project Design Consultant: Arcadis Geraghty & Miller
Sponsoring Department:
Transportation & Public Works
Department Director:
David Clark
Associated Organizations:
None
Other Interested Organizations:
State of Georgia, Dept. of Transp./L.A.R.P. Division
Verifications/Approvals: Date - References:
  • Mayor & Commission:August 01, 2000 - SPLOST Project Request
  • SPLOST Advisory Comm:July 12, 2000 - State of GA L.A.R.P. Program
  • Manager’s Office:July 10, 2000
  • Responsible Department: July 06, 2000

Current Status: Phase IV - Construction

REHABILITATION: Structural Asphalt Overlay including Preparatory treatment.
GDOT LARP/ACC CAPITAL/SPLOST
1 Belmont Court Forest Road Forest Road C
2 Brookwood Dr. Greencrest Dr. End C
3 Carlton Terr. Milledge Hgts. Marion Dr. C
4 Clarkewoods Rd. Jefferson River Rd. End C
5 Creekwood Dr. Vaughn Rd. Terminus C
6 Evans St. Hancock Ave. Broad St. (East) C
7 Gail Drive Bel Air Drive Bel Air Drive C
8 Hampton Park Dr. Oglethorpe Ave. E. Berkshire Dr. C
9 Holly Hills Dr. Winterberry Dr. Holly Hills Ct. C
10 Hunt Rd. Whitehead Rd. Edgewood Dr. C
11 Janice Dr. Whitehead Rd. Valleywood Dr. C
12 Kings Cir. Lavender Rd. Lavender Rd. C
13 Lake Drive Chalfont Ln. Michele Dr. C
14 Mallard Dr. Quail Run Dr. Camelot Dr. C
15 Marion Dr. Carlton Terr. Gran Ellen Dr. C
16 Michelle Dr. Lake Dr. End C
17 Myles Ct. Richard Way End C
18 N Lumpkin St. Broad St. Hull St. (North) NA
19 Nacoochee Ave. Boulevard St. Chattooga Ave. C
20 Oakmont Ct. Moores Grove Rd. End C
21 Old Fort Rd. Quailwood Dr. Dead End C
22 Oliver Circle Woodridge Cir. Woodridge Cir. C
23 Park Ave. Prince Ave. Boulevard C
24 Rumson Rd. Brentwood Dr. Dead End C
25 Sheats Dr. Timothy Rd. End C
26 Soule St. College Cir. College Cir. C
27 Spalding Cir. University Cir. End C
28 Springdale St. Bloomfield St. Church St. (South) C
29 Weymanda Cir. Milledge Ave. (South) End C
30 Whitehall Rd. Barnett Shoals Rd. S Milledge Ave. C
A-CC Capital / SPLOST
1 Birch Pl. Lombardy Dr. End C
2 Blue Heron Dr. Millstone Cir. End C
3 Branch St. Poplar St. Peter St. C
4 Cavalier Ct. Cavalier Rd. End C
5 Chatooga Ave. Nacoochee Ave. End C
6 Doe Run Old Lexington Rd. Dead End C
7 Hunters Pointe Dr. Quailwood Dr. End C
8 Mal Bay Rd. Xavier Dr. Oconee Co. Line C
9 Michelle Pl. Lake Dr. Michele Dr. C
10 Milledge Cir Lumpkin St. Westview Dr. C
11 Monroe St. College Ave. Athletic Field Parking C
12 North Ridge Dr. House 110 Jefferson River Rd. C
13 Oakbend Dr. Start of Rollback Curb End C
14 Old Epps Bridge Rd. Hawthorne Ave. Old West Broad C
15 Orchard Cir. Whit Davis Rd. Old Lexington Rd. C
16 S Billups St. Broad St. (West) Waddell St. C
17 Springtree Rd. Hilltop Rd. Gaines School Rd. C
18 Westview Dr. Westview Dr. Ext. Milledge Cir. C
19 Woodhaven Pt. Woodhaven Rdg. Dead End C
ADDITIONAL ROAD: Preparatory treatment for paving by GADOT in Winterville.
1 Peachtree St. Robert Hardeman Rd. Lakeview Dr. C
PREVENTIVE MAINTENANCE: Preservative treatments including Crackseal, Chipseal, Thin Overlay, Patching and Repair of high severity potholes, corrugation and rutting.
1 Agriculture Dr. E. Campus Rd. Morton Ave. C
2 Arch St. E. Broad St. Old Winterville Rd. C
3 Auburn Pkwy Providence Rd. Riverbottom Rd. C
4 Austin Dr. Auburn Pkwy. Dead End C
5 Barber St. Prince Ave. Newton Bridge Rd. C
6 Barnett Shoals Rd. Whitehall Rd. Whit Davis Rd. C
7 Belmont Rd. Barnett Shoals Rd. Morton Rd. C
8 Binion Rd. Herbert Rd. Springvalley Rd. C
9 Boley Dr. Commerce Rd. Freeman Dr. C
10 Canterbury Pl. Canterbury Dr. Cantebury Dr. C
11 Cedar Shoals Dr. Gaines School Rd. Whit Davis Rd. C
12 Cherokee Rd. Athens Rd. US 78 C
13 Cherry Ln. Ruth St. Dead End C
14 Cleveland Ave. Cleveland Ave. Barber St. C
15 Cleveland Rd. Atlanta Hwy. Atlanta Hwy. C
16 Coile Dr. Mitchell Bridge Rd. End C
17 Conway Dr. Ben Burton Rd. Dead End C
18 Creek Plantation Dr. Tallassee Rd. End C
19 Crestview Dr. Glencrest Dr. Dead End C
20 Danielsville Rd. Perimeter Ila Rd. C
21 Dearing St. Evans St. Dead End C
22 Deer Creek Dr. Vincent Dr. End C
23 Deer Hollow Rd. Cleveland Rd. Deerhill Dr. C
24 Deer Trail Deer Creek Dr. Newton Bridge Rd. C
25 MLK Jr. Pkwy. Perimeter North Ave. C
26 E Campus Rd. Milledge Ave. (South) Rogers Road C
27 Fourth St. MLK Jr. Pkwy. Dead End C
28 Fowler Mill Rd. Cleveland Rd. Atlanta Hwy. C
29 Freeman Drive Loblolly Drive Boley Drive C
30 Gayle Court Winter Hill Dr. End C
31 Hanover Court Hanover Dr. End C
32 Helican Springs Rd. Smokey Rd. Madison County Line C
33 Herbert Road Dwight Road Binion Rd. C
34 Hillsborough Dr. Woodhaven Dr. Eb C
35 Ila Rd. Danielsville Rd. County Line C
36 Jackson St. Hoyt St. Baldwin St. C
37 Jarnagin Dr. College Cir. College Cir. C
38 LakeForest Cir. Rivercliff Dr. End C
39 Lakeforest Dr. Lakeforest Cir. End C
40 Lem Edwards Rd. Old Elberton Rd. Madison County Line C
41 Leora Cir. Aubrey Dr. End C
42 Live Oak Ct. Live Oak Dr. End C
43 Mercer Lane Monty Drive Monty Drive C
44 Morton Rd. Lexington Rd. Belmont Rd. C
45 Moss Rd. Glendale Hts. Athens Rd. C
46 N Hull St. Hancock Ave. (West) Broad St. (East) C
47 N Rocksprings St. Broad St. (West) Glenhaven Ave. C
48 New Haven Dr. Providence Rd. End C
49 Newton Bridge Rd. Chase St. (North) Kathwood Dr. C
50 Nicole Cir. Rustwood Dr. Rustwood Dr. C
51 Oakwood Terr. Lakeland Dr. Lakeland Dr. C
52 Oglethorpe Terr. Willow Run Dead End C
53 Old Elberton Rd. Voyles Rd. Madison County Line C
54 Old Lexington Rd. 100 Ft Past Bridge East Lexington Road C
55 Old Monroe Rd. US 78 #330 Old Monroe Rd. C
56 Old Winterville Rd. Oconee St. Arch St. C
57 Olympic Court Olympic Dr. Dead End C
58 Olympic Pl. Olympic Dr. Dead End C
59 Paris St. Henderson Ext. Baxter St. C
60 Parkview Drive Main St. Oglethorpe Co. Line C
61 Pheasant Run Fowler Mill Rd. End C
62 Pine Bluff Rd. Commerce Rd. Dead End C
63 Produce Ln. Winterville Rd. Dead End C
64 Quailwood Dr. Tallassee Rd. Whitehead Rd. C
65 Queens Rd. Kings Rd. Kings Rd. C
66 Ranick Rd. Winterville Rd. Springvalley Rd. C
67 Redstone Dr. Cedar Shoals Dr. Highland Park Dr. C
68 Richmond Way Chesterfield Rd. Imperial Way C
69 Riverbottom Rd. Woodhaven Dr. New Pavement Joint C
70 Rowe Road Barber St. Chase St. C
71 Rustwood Drive New Pavement Tallassee Road C
72 S. Chase St. Cobb St. Hancock Ave. (West) C
73 S. Lumpkin St. Macon Hwy. Riverview Road C
74 Sandstone Cir. Sandstone Dr. Sandstone Dr. C
75 Sandstone Dr. Dunwoody Dr. Cedar Springs Dr. C
76 Sartain Dr. Winterville Road End C
77 Shoemaker Court Jockey Club Drive End C
78 Sir Scott Road North Bluff Road North Bluff Road C
79 Smokey Road Nowhere Road Helican Springs Rd. C
80 Springtree Road Lexington Road Hilltop Road C
81 Strickland Avenue MLK Jr. Pkwy. North Ave. C
82 Summerplace Drive Cherokee Road End C
83 Sunny Hills Drive Danielsville Road Dead End C
84 Talmadge Street Bloomfield St. Church St. C
85 The Plaza Hancock Ave. Hill Street C
86 Vine Street Peter Street Dublin St. C
87 Voyles Rd. Ga. 72 Old Elberton Road C
88 W. Hancock Ave. Pulaski St. Foundry St. C
89 Walker Drive Danielsville Rd. Dead End C
90 Wall Street Clayton St. Broad St. (East) C
91 Weatherly Woods Dr. Beaverdam Rd. End C
92 Willow St. East Broad St. College Avenue C
93 Winchester Way Pointers Ridge Drive End C
94 Windy Hill Way Windy Hill Place Windy Hill Court C
95 Woodhaven Drive Mitchell Shoals Ct. End C
96 Woodhaven Terrace Woodhaven Parkway End C
DEFERRED ACTIONS: Crackseal, Chipseal, Patching and Repair of High Severity Potholes, Corrugation and Rutting.
1 Alden Court Cedar Shoals Drive End C
2 Lyons Road Ben Epps Drive Dead End C
3 Olympic Drive Voyles Rd. Perimeter C
4 Saxon Woods Dr. Newton Bridge Rd. Goddard Rd. C
5 Spring Valley Rd. Voyles Rd. Winterville Rd. C
6 Tallassee Road Westchester Dr. Jackson Co. Line C

Action taken since last Report:

Group A (FY01) package – Project is complete.
Group B (FY02) package – Project is complete.
Group C (FY03) package – Project is complete.
Group D (FY04) package – Project is complete.
Group E (FY05) package – Project is substantially complete.