PROJECT
05 - DOWNTOWN INFRASTRUCTURE IMPROVEMENTS
NOTE:
See Also SPLOST 2000 Project #26:
Downtown Infrastructure Improvements
Campaign
Statement: Resurface streets with low curbs, repair broken sidewalks,
replace aging inadequate storm sewers, and correct drainage problems.
Project
Location: Downtown Athens; portions of Clayton, Pulaski, Hancock,
and Thomas Streets
Allocated
SPLOST IV Budget: $ 2,500,000
Additional
SPLOST IV Funds Allocated: $ 500,000 (Amendment 1 - June 15, 1999)
& $500,000 (Amendment 2 - April 4, 2000)
Revised
SPLOST IV Budget: $ 3,500,000
PROJECT
DESCRIPTION:
CE: SUM99
01 - 01 Project Description identifies work to be accomplished in
TWO SECTORS (46 & 47) and subsequent TASKS as outlined
below:
- TASK
/ DESCRIPTION / CONSTRUCTED BY:
- A
Utility Main Installation - Public Utilities/Public Works
- B
Storm Water System - Private Contractor
- C
Utility Service Connections - Public Utilities
- D
Streetscape - Private Contractor
- a.) SECTORS
46 & 47 TASK A - Installation of a new water and gas mains
from Thomas Street to College Avenue along Broad Street. This
was a utility line replacement only, there was no streetscape modifications
in this phase.
- Current
Status: PROJECT IS COMPLETE.
CE: WTR00
01 - 01 identifies work to be accomplished in FIVE SECTORS (12,
13, 31, 32, 36) and subsequent TASKS as outlined below:
- TASK
/ DESCRIPTION / CONSTRUCTED BY:
- A
Utility Main Installation - Public Utilities/Public Works
- B
Storm Water System - Private Contractor
- C
Utility Service Connections - Public Utilities
- D
Streetscape - Private Contractor
- a) SECTORS
12 & 13 TASK B: Installation of a new storm water line on
Hancock Street along Thomas to North Avenue. This is a storm
water line replacement only, there will be no streetscape modifications
in this phase.
- b) SECTORS
31 & 32 TASKS A,B,C,D:Installation of new utility lines, storm
water system, utility service connections, and streetscape will commence
on Clayton Street from Pulaski Street to Lumpkin Street.
- c)
SECTOR 36 TASK B: Installation of a new storm water line on Pulaski
Street from Broad Street to Clayton Street. This is a storm water
line replacement only, there will be no streetscape modifications in
this phase.
CE: SUM00-02-01
Project Description identifies work to be accomplished in TWO SECTORS
(46 & 47) and FOUR GATEWAY INTERSECTIONS (36/43, 45/46, 47/42,
13/48) with subsequent TASKS as outlined below:
- TASK
/ DESCRIPTION / CONSTRUCTED BY:
- A
Utility Main Installation - Public Utilities/Public Works
- B
Storm Water System - Private Contractor
- C
Utility Service Connections - Public Utilities
- D
Streetscape - Private Contractor
- a) SECTORS
46 & 47 TASKS A,B,C,D: College Avenue to Thomas Street along East
Broad Street.
- TASK
A - Installation of a new 16" water main that ties the previously
installed 12" lines together.
- TASK
B - Upgrade and install a new storm water system
- TASK
C - Provide new utility service connections along with meters and
backflow devices
- TASK
D - Install new streetscape features such as brick pavers, lights,
tree grates, trees, road surface and curbing.
- b) SECTORS
36 & 43 GATEWAY INTERSECTION TASKS D:Installation new streetscape
features such as brick pavers, lights, tree grates, trees, road surface
and curbing at the intersection of Pulaski Street and East Broad
Steet. Special Note: Sectors 36 & 43 Gateway Intersection
Construction is contingent upon the progess of CE:WTR00-01-01-36A -
Pulaski Street Utility Main Installation.
- c)
SECTORS 45 & 46 GATEWAY INTERSECTION TASK D: Install new streetscape
features such as brick pavers, lights, tree grates, trees, road surface
and curbing at the intersection of Thomas Street and East Broad Street.
- d)
SECTORS 13 & 48 GATEWAY INTERSECTION TASK B & D: Install
new streetscape features such as brick pavers, lights, tree grates,
trees, road surface, curbing and storm water enhancements at the intersection
of Thomas Street and Dougherty Street.
CE:
WTR01-01-01 - Broad Street - College Avenue to Pulaski Street:
CE:
SUM01-02-02 - Broad Street - College Avenue to Thomas Street:
- Current
Status:
- Task
D - Streetscape Construction scheduled to begin May 2001
Project
Design Consultant: The RBA Group
Sponsoring
Department: Public Works, Public Utilities, Central Services
Department
Director: David Clark, Gary Duck, Steve Martin
Associated
Organizations: Athens Downtown Development Authority, Project Liaison:
Art Jackson
Other
Interested Org.: Downtown Council
Verifications/Approvals:
- Mayor
& Commission: March 7, 2000 - SPLOST Project Request
- SPLOST
IV Advisory Comm: Feb. 2, 2000 - Urban Design Action Plan For Downtown
Athens
- Managers
Office: Jan. 24, 2000
- Responsible
Department: Jan. 7, 2000
Current
Status
- ALL
SPLOST IV FUNDED CONSTRUCTION ELEMENTS ARE COMPLETE
|