Construction of a replacement Fire Station #5 located at 1090 Whit Davis Road.  This project includes land acquisition, design, construction, fueling station, station equipment, and other related costs to meet facility standards for a one-story suburban design.  Design will be comparable to the recent station constructed on Cleveland Road, a new 12,000 square foot three bay fire department facility.  The prototype design provides adequate space for current and future expansion.   An expected life-cycle of 50 was indicated at that time, however this is proving overly optimistic.   The new facility could be built with solar energy systems to reduce operating cost of the facility.

Estimated Cost:  
SPLOST 2020 Budget
$6,444,000
Estimated Annual Operating Impact
$17,400