Sub-Project 2: Old Winterville Rd to Hancock Rd

In combination with SPLOST 2011 Project 8 Sub-Project 2, Old Winterville Road to Hancock Road construction budget will be funded through the TSPLOST portion of this project.

Project Details

Sub-Project #2 consists of approximately 1.8 miles of multi-use concrete trail with necessary appurtenances. It includes necessary land acquisition efforts for a non-automobile pathway along the existing rail bed corridor that will begin at the intersection of Old Winterville Road proceed east generally following the abandoned rail line and ending at Hancock Road. This section includes a bridge over GDOT’s proposed Loop 10 on-ramp.  The Project Concept for Sub-Project #2 was approved by M&C on July 5, 2016.  All Property between Old Winterville Road and the Loop has been acquired.

Project Updates

On March 5, 2019, Mayor and Commission approved the preliminary plans authorizing staff to develop final plans and coordinate final bridge design with GDOT. Easement acquisition is in progress, along with final coordination with GDOT. The tentative bid advertise release is schedule for Spring 2020.

*as of 11/15/19

Was this page helpful for you? Yes No