Athens in Motion logo

Updated 4.18.18

Public comment will be accepted online through Friday, April 27, 2018 for the proposed network and pedestrian network plans:

Network Map


This map shows the proposed overall or primary active transportation network for the entirety of Athens-Clarke County. This network is not all new infrastructure, but rather builds on existing and funded facilities such as bike lanes and greenways. The “Proposed Connections” are areas of the network that will need bicycle infrastructure or bicycle and pedestrian infrastructure, depending on land use context, to enhance safety and connectivity.

A PDF of the proposed network map is available for download (2.5 mb)

Pedestrian Network


This map shows current pedestrian conditions along the primary network (illustrated in the Network Map). Specifically, this map illustrates where there sidewalk currently exists, where there are gaps, and where there is currently not any sidewalk. In addition, this map illustrates pedestrian improvements that are funded or in progress, such as TSPLOST funded greenways and projects that are on the ACCUG sidewalk gap program list. The majority of this map reflects the same network as the Network Map, however, there are specific pedestrian only improvements that are illustrated in this map.

A PDF of the proposed pedestrian network is available for download (2.5 mb)

Powered by CivicSend - A product of CivicPlus